Before the Walls Close
Electrical rough-in is the stage when wiring, boxes, and pathways are installed before wall and ceiling finishes conceal them. A checklist helps the project team review visible work, capture incomplete items, and coordinate corrections while access is still available.
Always follow approved plans, local electrical codes, permit requirements, and the direction of the licensed electrician responsible for the installation.
Coordinate the Layout
Compare visible outlet, switch, lighting, and equipment locations with the latest approved plans. Check that boxes and cable routes appear organized and protected from likely damage by later framing, drywall, or finish work. Confirm that required pathways and provisions for planned equipment are present, and record any location that differs from the drawings.
Note areas where other trades may affect electrical work, such as plumbing, HVAC, cabinetry, or structural components. Document conflicts for review rather than moving wiring or changing the design on site.
Record What Needs Professional Review
Use the checklist to note incomplete boxes, exposed or unsupported wiring, damaged cable jackets, crowded routes, missing labels, or other visible concerns. Include the room, wall, or circuit reference when known. Do not treat a visual walkthrough as verification of conductor sizing, circuit capacity, grounding, or code compliance.
Do not touch, energize, test, or modify wiring unless you are authorized and qualified to do so. Electrical inspection, testing, and corrections should be handled by the licensed electrician and applicable inspection authority.
Close Out Before Finishing
Mark each item Yes, No, or N/A and add comments for anything requiring attention. Keep a record of plan revisions, photos where permitted, and the person responsible for follow-up. Confirm required professional inspections and approvals before the walls or ceilings are closed.